The Rokach/Yarkon Bridge is the longest bridge among those on the Green Line. The Reading light rail station will be located on the bridge. The station bridge and its platforms have already been cast, and now the construction of the station structure in steel has begun. The beams were installed in the opening above the stream over two nights this week. The operation was closely accompanied by police during transportation and roadblocks near the lifting site.