The length of the new road that was paved, due to the change in the route of the existing road to a safer one, and connecting the Poleg Junction to the Beit Yehoshua Junction, is about 3 km. The length of the new bridge built over the railway track is about 120 meters and its height is about 8 meters. Two traffic-signaled intersections are planned along the new road: one - a new intersection that will serve the Beit Yehoshua Industrial Zone and the train station and parking lot. The second - at the existing intersection for Moshav Udim North, which